Operations and maintenance

Improve your bottom line by ensuring your equipment is running at its highest efficiency.

A/C and heat pump tune-up rates

Energy Smart helps keep your HVAC equipment running at peak performance with incentives for A/C, heat pump and chiller tune-ups. Schedule your HVAC equipment tune-up with an Energy Smart trade ally contractor, or utilize the commercial HVAC tune-up application with your own provider.

Minimum capacity (tons) Maximum capacity (tons) Tune-up incentives
1.5
3.5
$225
4
5
$275
6
10
$450
11
15
$650
16
25
$800
26
30
$850
31
50
$1,400
51
80
$2,500
80+
$2,500

Chiller tune-up rates

Chiller tune-up measure Incentive Unit
Tune-up of air-cooled chiller
$15
per ton
Tune-up of water-cooled chiller (reciprocating, rotary screw, scroll)
$9
per ton
Tune-up of water-cooled chiller (centrifugal)
$9
per ton

**Incentive caps apply.

Retro-commissioning

Retro-commissioning (RCx) is the process of improving the performance and energy efficiency of building systems, equipment and operations. Retro-commissioning allows you to manage energy use more effectively, increase comfort and catch small maintenance needs before they become costly repairs.

Compressed air leak remediation

The Energy Smart compressed air offering provides cash incentives to identify and repair leaks, generating substantial energy and cost savings for Entergy New Orleans customers. 

Did you know that 20-30% of a compressor’s output can be wasted due to compressed air leaks? Use Energy Smart incentives to repair and save today.

Compressed air system operating schedule Incentive**
24/7 operation (24 hours/day, 7 days/week)
$90 per leak repaired
Three-shift (24 hours/day, 5-6 days/week)
$85 per leak repaired
Two-shift <(16 hours/day, 5-7 days/week)
$60 per leak repaired
Single-shift (8 hours/day, 5-7 days/week)
$30 per leak repaired

** Incentive caps apply; see compressed air offering overview below.

Custom projects can earn incentives

Do you have an operations and maintenance scope outside of our standard offerings? These may include building automation system upgrades, premium efficiency motor and Variable Frequency Drive (VFD) installations, process improvements and more. Custom incentives are based on your project’s first-year energy savings, and all custom projects require pre-approval.

Scroll to Top